System Start-Up

Powering On (Power, Pressure, Temperature)

Key Points
  • Closing Pressure Valve
  • Connecting Air Hose To Compress
  • Power On
  • Set Temperature

The Xylem X3 produced filled vaporizer with the press of a button – with parts handling filling and capping occurring within the machine.

Highlights

00:01
Slide the pressure valve to the right to ensure that it is closed.

00:03
Connect and power on the air compressor to allow the tank to fill.

00:07
Turn the power switch clockwise to power on the system.

00:20
Set temperature using the presets to the desired setting depending on the material to be used.

The Xylem X3 should be powered on and pressurized before a production run with enough time for the system to reach the desired temperature.