Install on a flat non-vibrating surface in a low dust location. Install in a well lit & air conditioned environment.DO NOT locate in a hydrocarbon fume environment (C1D1, C1D2)

Installation Environment Requirements

Key Points
  • Install on a flat non-vibrating surface in a low dust location
  • Install in a well lit & air conditioned environment
  • DO NOT locate in a hydrocarbon fume environment (C1D1, C1D2)
  • Make sure power sockets are rated @ 20A with at least 10A supplied

Xylem system installation environment

Highlights

00:08
Locate in well lit, flat, vibration free environment. Lighting is necessary to observe all operational components. The Xylem-3 uses vibration components that can be disrupted if by other vibration sources.

00:18
Ventilation is nessisary for opertator safety. Low dust keep the moving moving components from becoming dirty and causing errors.

0:33
Having a minimum of a 10x10ft working space allows for easy access to inputs and ease of servicing the system.

0:33
Having a minimum of a 10x10ft working space allows for easy access to inputs and ease of servicing the system.

00:55
Air conditioning is necessary to maintain operating order of the Xylem-3. The system contain 2 PLC controllers that require the environment to be be between 65-85F.

The Xylem vape cartridge production system must be placed in a well-ventilated lab, manufacturing environment or an equivalent enclosure that is capable of exhausting @ 2.5 m3 /min (90 ft3 /min). Follow local and national safety regulations for installing any equipment.

Never install or use the system near a potential hydrocarbon fume source like a C1D1 or C1D2 environment.

The total weight of the package including the system is between 300-350lbs depending on the system configuration. Use suitable lifting equipment when moving the system.