Key Points
- Install on a flat non-vibrating surface in a low dust location
- Install in a well lit & air conditioned environment
- DO NOT locate in a hydrocarbon fume environment (C1D1, C1D2)
- Make sure power sockets are rated @ 20A with at least 10A supplied
Xylem system installation environment
Highlights
00:08
Locate in well lit, flat, vibration free environment. Lighting is necessary to observe all operational components. The Xylem-3 uses vibration components that can be disrupted if by other vibration sources.
00:18
Ventilation is nessisary for opertator safety. Low dust keep the moving moving components from becoming dirty and causing errors.
0:33
Having a minimum of a 10x10ft working space allows for easy access to inputs and ease of servicing the system.
0:33
Having a minimum of a 10x10ft working space allows for easy access to inputs and ease of servicing the system.
00:55
Air conditioning is necessary to maintain operating order of the Xylem-3. The system contain 2 PLC controllers that require the environment to be be between 65-85F.
The Xylem vape cartridge production system must be placed in a well-ventilated lab, manufacturing environment or an equivalent enclosure that is capable of exhausting @ 2.5 m3 /min (90 ft3 /min). Follow local and national safety regulations for installing any equipment.
Never install or use the system near a potential hydrocarbon fume source like a C1D1 or C1D2 environment.
The total weight of the package including the system is between 300-350lbs depending on the system configuration. Use suitable lifting equipment when moving the system.